0.5-100mm Rubber Coated Steel Balls

Get durable and long-lasting 0.5-100mm rubber coated steel balls from our factory. Perfect for industrial applications. Shop now for high-quality products.
Request a Quote

PRODUCTS DETAILS

Basic Info.

Model NO.
steel balls
Universal
Yes
Type
Bearing Ball
Material
AISI1015/C15/Xc12/S15c Carbon Steel Ball
Size
3.175mm Carbon Steel Ball
Grade
G100 Carbon Steel Ball
Weight of 1000 PCS
0.131kg Carbon Steel Ball
Characteristic
Good Characteristics of Superficial Hardness
Application
Roller, Sliding Block, Low Quality Bearings, Oiler
. Magnetic
Yes
.Packing
Standarded or as Customer Required
Conditioning
Dry or Oiled of Carbon Steel Ball
.Delivery Time
Stock Within a Short Time or 35 Days
Shape
Round Carbon Steel Ball
Transport Package
Box, Plastics Bag, Steel Drum
Specification
BV
Trademark
SUHUA
Origin
Jiangsu China
HS Code
8482910000
Production Capacity
300 Tons Per Month

Product Description

0.5-100mm Rubber Coated Steel Balls
Featrue:
1.  Casehardened surface balls and low hardness core.
2. Good characteristics of superficial hardness, low resistance to corrosive attack, magnetic.

3. 
Used in cycle industry, and yet remain substantially cheaper than balls manufactured
from high carbon chrome alloy steel.
Specification: 
Low carbon steel ball
1. Material AISI1010/ AISI1015/ C15/ 1.0413/ JIS SWRM 12/ EN32 ASTM A/29
2. Size Range 1mm-180mm
3. Grade G40-1000
4. Hardness 60 min. HRC (Surface-hardend)
5. Characteristic (a)Casehardened surface balls and low hardness core
(b)superficial hardness
(c)Low resistance to corrosive attack 
6. Magnetic Yes
7. Application Low quality bearing, oiler, roller, sliding block
8. Chemical composition  
  C% Si%  Mn% Cr%  Ni% Mo% P% S%  Al% Cu%
min. 0.12 --- 0.30 --- --- --- ---- --- --- ---
max. 0.17 0.30 0.60 0.20 0.25 0.05 0.035 0.035 0.01 0.3
9.Packing Standard: 10kg or 20kg per carton,
1 ton per pallet or as customer required
10.Conditioning  dry or oiled
11.Delivery time Stock within a short time or 35 days.
CHANGZHOU HUARI STEEL BALL CO., LTD.

Application:
0.5-100mm Rubber Coated Steel Balls


Production process:  
Manufacture process of steel balls
Step 1 Heading Balls blanks are cold headed from rolls of wire.
Step 2 Flashing Rolling balls between two hard alloy plates to removes the slight band
and small protrusions.
Step 3 Heat treat Heating balls to a high temperature in furnace and quenching balls in a liquid bath.
Step 4 Rough grind Rolling balls between the face of a fixed iron plate and a very hard fire-grit grinding wheel. Then rolled the hardened ground balls between two cast iron plates.
Step 5 Cleaning The final production operation cleans the finished balls and adds a shiny luster.
Step 6 Final
          Inspection
Balls are gauged, visually inspected and subjected to other quality tests to insure
every customer's specifications are achieved.
Step 7 Packaging The balls are packaged in accordance with customer specifications for shipping.


0.5-100mm Rubber Coated Steel Balls

Packaging:
Type 1:   Plastic bag + box + carton + wooden pallet
Type 2:   Plastic bag + carton + wooden pallet 
Type 3:  Our package: export cartons, steel drums, wooden pallets

0.5-100mm Rubber Coated Steel Balls


About us:
1. Established since year 1986, more than 27 years experience and specialized in steel balls manufacturer and ball related products.
2. High precision instruments and technical staffs.
3. Offer the good quality service and product with short delivery times.
0.5-100mm Rubber Coated Steel Balls

Mian products:
0.5-100mm Rubber Coated Steel Balls


Services:

1. All the inquiries will be reply within 24 hours
2. For the steel ball, please kindly let us know the size, material, grade and quantity.
3. For the bearing, please kindly let us know bearing type, material, Accuracy Grade/Class, and quantity.


Certification:
0.5-100mm Rubber Coated Steel Balls


FAQ:

Q1: What kind of ball can supplied by Huari?

A: Stainless steel ball, Chrome steel ball, Carbon steel ball, Brass ball, Aluminum ball, Copper ball, coated ball.


Q2. What is your terms of payment?

A: T/T 30% as deposit, and 70% before delivery.


Q3. What is your terms of delivery?

A: EXW, FOB, CFR, CIF.


Q4: How many days for delivery?

A: Inventory with 1-3 days or 25-30 days. The specific delivery time depends on your quantity.
 


Any futher query, please do contact us anytime.

 

Contact us

Please feel free to give your inquiry in the form below We will reply you in 24 hours